Product details
OUT OF PRINT - NOT AVAILABLE
Work with the 2008 edition to make sure you have the latest criteria for the safe design, construction, installation and operation of all LP-Gas systems, as well as highway transportation of LP-Gas. The 2008 NFPA 58 includes a new section that addresses small LP-Gas system operators and aids compliance with DOT regs.Work with the 2008 edition to make sure you have the latest criteria for the safe design, construction, installation and operation of all LP-Gas systems, as well as highway transportation of LP-Gas. The 2008 NFPA 58 includes a new section that addresses small LP-Gas system operators and aids compliance with DOT regs. Currently covered by U.S. Department of Transportation, regulations for pipeline systems of 10-100 users served from one propane tank, such as a mobile home park, are now part of the 2008 LP-Gas Code. Including these requirements will assist propane marketers in complying with what is already federal law, and the simplified Code language makes requirements easier to understand and apply.